The paid first step

FM Risk Audit

Three plants. Ten days. One PE-signed picture of your roof risk, your insurer exposure and your next five years of spend.

$15,000

per plant

3 plants

minimum

10 days

start to read-out

Fee is 100% prepaid. Travel is billed at cost. Fee is credited toward a pilot plant if you proceed within 60 days.

What you receive

  • Roof-section inventory with area, assembly, age and warranty dates for each plant
  • FM / insurer exposure review: wind uplift ratings, hail, ponding, fire-separation and roof-access items
  • Drone and infrared survey where conditions allow, with moisture suspect areas mapped
  • Open-findings list ranked by severity, each with a recommended action and cost range
  • First 5-year capital-plan forecast for each plant and the three combined
  • 5M Property File score (Manpower, Management, Methods, Materials, Measures) — what is on record and what is missing
  • One-hour read-out with your facilities, risk and finance leaders

How the ten days run

Day 0

Agreement signed and fee prepaid. We send a short document request: drawings, warranties, insurer reports.

Days 1–7

Field PE and drone tech visit each plant. Staff interviews capture what is not written down.

Days 8–10

AI drafts the record; a licensed PE reviews, signs and releases the report. Read-out meeting.

Why owners trust the result

ProofPE accepts compensation exclusively from the facility owner. We hold no subcontracts, sell no products and take no contractor or manufacturer money.

Request an FM Risk Audit

Tell us which plants you have in mind. An engineer — not a salesperson — replies with dates and the agreement.